Black Cosmic granite swatch

Granite

Natural stone in a wide range of colors. Seal every 1–3 years.

Granite countertops

Calacatta Gold marble swatch

Marble

Classic veining; softer and develops a patina.

Marble countertops

Viatera Calacatta Sol quartz swatch

Quartz

Engineered, consistent and never needs sealing.

Quartz countertops

Taj Mahal quartzite swatch

Quartzite

Marble-like movement with granite-like hardness.

Quartzite countertops

Dekton Laos porcelain swatch

Porcelain & Dekton

Made for sun and heat; never needs sealing.

Porcelain countertops

Kitchen island with a waterfall end and bookmatched backsplash

Kitchen countertops

Islands, perimeters and backsplashes

Double vanity with a white stone top

Bathroom countertops

Vanity tops and shower walls

Template outline being marked on a slab

Countertop installation

Templating, fabrication and install

Also

For pros

Every project starts with a free in-home template visit.

Areas we serve

Lee, Collier & Charlotte counties.

Homeowners, builders and designers across Southwest Florida.

Showroom

11741 Metro Pkwy
Fort Myers, FL 33966

Mon–Fri 9–5 · Sat 9–1

Veined stone island under a black and brass hood

Project videos

Walkthroughs of finished HB installs

Long veined stone island and perimeter counters

Finished spaces

Kitchens, baths and outdoor rooms

Kitchen island with a stone top under drum pendants

Inspiration

Ideas to bring to your consultation

Follow the work

How Long Does It Take to Install Countertops? From Template to Finish

Brown and cream veined island with blue bar stools in front of white cabinets and a stainless range.

How long does it take to install countertops? Our usual window is 10 business days from templating to installation, and that’s a typical timeline, not a promise. The installation itself happens at your home, and the weeks before it are spent choosing a slab, measuring your cabinets and approving a layout.

Here’s the whole path from first visit to finished tops, so you can plan around it, whether that’s a remodel with a deadline or a house you only use part of the year.

How Long Does It Take to Install Countertops? The Full Timeline

A stone countertop project has six steps: showroom visit and estimate, choosing your slab, templating at your home, layout review, fabrication, and installation. The 10 business days covers the last four: templating, layout review, fabrication and installation. The first two steps depend on how quickly you decide, and that’s the part you control.

Where the 10 business days fits

The clock starts at templating, when we measure your cabinets, and runs to installation. In between, you approve the layout and we cut and finish your stone in-house at our Fort Myers facility, using CNC equipment and digital templating. Because we fabricate it ourselves, we’re not waiting on another shop.

Why it’s a typical window and not a promise

We don’t promise timing before we’ve seen your job. A simple kitchen and a large one with an island, a full-height backsplash and several cutouts aren’t the same amount of work, and a late change from you resets the plan. Think of 10 business days as what we usually see when the cabinets are ready and your selections are final.

Finished white island in an open kitchen, the end result when you ask how long it takes to install countertops.
A finished kitchen island from an HB project.

From Showroom Visit to Templating

This stretch has no fixed length, and most of it is yours to set. It’s also where a project is easiest to speed up.

Estimate and slab selection

You visit the showroom, bring photos and cabinet drawings if you have them, and we talk through the space and what shapes your estimate. Then you walk the slabs in person. Color, veining and movement look different in real light than on a screen, and you approve the slab for your job before anything is cut. If you’re torn between two stones, it’s better to take the extra visit than to rush.

Getting the kitchen ready to measure

Templating works best when the cabinets are installed, level and secured, and when your sink, faucet and cooktop are chosen. If the cabinets are still being built or delivered, templating has to wait for them, and so does everything after it. Our guide to what happens at a template visit covers the checklist.

If you’re planning around a remodel schedule, the day your cabinets go in is usually the one that sets the countertop date. Tell us that date when you request an estimate.

Working with your contractor

If a contractor or builder is running the job, we coordinate with them on templating and installation, including cabinet readiness and fixture models. Giving us their contact early keeps the handoffs from becoming the slow part.

Seasonal homes and travel dates

Many Southwest Florida homeowners are only in town part of the year. If that’s you, share your dates when you request an estimate. Templating and installation both happen at your home, so it helps to line the visits up with when you or someone you trust can be there to give access.

Templating to Installation: 10 Business Days

After we measure, three things happen before the stone arrives at your home.

These three steps are the part we run on our own schedule, and they’re the reason we can describe a typical window at all. Here’s what each one involves.

Layout review

You see how the slab will be laid out, including where seams and veining fall, and you approve it before we cut. This is the one chance to move a vein or shift a seam, so it’s worth a careful look. A prompt answer from you keeps the window intact, so set aside a few minutes the day the layout reaches you and read it against your cabinet plan.

Fabrication

Your stone is cut, shaped and finished to the template and the approved layout, including edges and cutouts. That happens in our shop, not at your home, so your kitchen stays quiet during this stretch and you can use that time to line up your plumber or finish the backsplash prep.

Scheduling the install

We confirm the installation date with you, and you’ll want the room clear and the entry accessible by then. If a cabinet size changes during a remodel, tell us right away, because a different or matching slab is sometimes needed.

Island top with an undermount sink, brass faucets and a waterfall end, installed and ready to use.
An installed island top from an HB project.

Installation Day and What Can Change the Timeline

On installation day, our installers confirm the layout against your cabinets, set each piece, join seams with color-matched adhesive and fit the sink and cooktop cutouts. They protect your floors while they work and clean up when they’re done.

How long the install takes

A 2017 homeowner article on UseNaturalStone.org puts a typical installation at roughly four to eight hours, with large areas taking more than a day. That’s a general range for the trade, not a statement about your project. Your layout, the number of pieces and the access to your home set the real number, and we’ll talk it through when we schedule.

What can push the timeline out

  • Cabinets not ready: uneven, unsecured or still-changing cabinets hold up templating.
  • Unfinished selections: a sink or cooktop model that isn’t chosen changes the cutouts.
  • Changes after templating: a bigger island or a moved sink means new measurements, and sometimes a different slab.
  • Layout approval: the cutting waits until you’ve signed off on the layout.
  • Plumbing and electrical: sink and appliance disconnects are usually handled by a plumber or your contractor, so line them up for install day.

What you can do on the day

Clear a path from the door to the kitchen, and move fragile items away from the work zone. Expect some noise and plan for access through your entry. Before the crew wraps up, look over the finished tops and point out anything you want checked.

Removing your old countertops

Removal of existing tops is a common question, and it affects how the day goes. Ask us about it when you request your estimate, and we’ll explain what’s involved for your home. For help with a kitchen on the Estero side, our Estero countertops page shows the areas we work.

If you’re in Fort Myers and want to start, stop by our showroom and walk the slabs. With 20+ years behind us, we’d rather give you a realistic schedule than a fast-sounding one. You can read our countertop installation process for the full six steps.

Frequently Asked Questions

How long does it take to install a granite countertop?

Our usual window is 10 business days from templating to installation, which includes layout review and fabrication. The installation itself is done at your home, and its length depends on your layout and access.

Do countertop installers remove old countertops?

Often, but it depends on the existing material and your project. Ask us when you request an estimate, and we’ll explain what removal involves and who handles plumbing disconnects.

When can I use my sink again?

That depends on the plumbing reconnect, which a plumber or your contractor usually handles, and on the seam adhesive. Ask the crew on installation day and they’ll tell you what’s ready.

How long before I can use my new countertops?

Ask the crew on installation day what, if anything, to wait on before you use the counters. If you chose natural stone, ask about the sealing schedule for your slab. Quartz and porcelain don’t need sealing.